Construction

2017 Sanitary Sewer Lining


This project will involve the installation of cured-in-place pipeliner in existing sanitary sewer in several locations within the City as shown on the attached map. This project may begin as early as June and should be completed by November. Impacts to traffic are expected to be minimal; however daytime lane and roadway closures should be expected.
   

Kennedy Road Shared-Use Path - ITEP


This project utilizes Federal funds and will consist of the installation of a 8-10 foot wide shared-use path along Kennedy Road from Illinois Route 47 to Bridge Park as shown on the attached map. The project is scheduled to be begin in July and should be completed by the end of November. Impacts to traffic are expected to be minimal; however daytime lane and roadway closures should be expected. 

Route 34 Improvements


This IDOT project consists of the reconstruction of US Route 34 from Route 47 to Orchard Road in Oswego. The project began in January 2016 and is anticipated to be complete by December 2018. Significant traffic delays are expected.